Online tools - Enviraj

Roof Area (Sq.m)

Peak Hourly Rainfall (mm)

Roof Slope

Pipe Dia (mm)


Total Roof Drains Required

Slope

  • 0.5 % grade = 0.5 cm per 100 cm run = 0.0625 inch per 1 ft run
  • 1 % grade = 1 cm per 100 cm run = 0.125 inch per 1 ft run
  • 2 % grade = 2 cm per 100 cm run = 0.250 inch per 1 ft run